TGB Blade 250 ATV Quad Service Repair Manual, Page 11Get this manual

TGB Blade 250 ATV Quad Service Repair Manual, Page 11

1GENERAL INFORMATION z! !l B When separating connector, it locker has to be unlocked firstlyThen, conduct the service operation
wire bands at the designated locationsTighten the bands so that only the insulated surfaces contact the wires or wire harnesses0
Make sure if the connector pins are bent, extruded or loosen Wire band and wire harness have to be clamped secured properly0
Insert the connector completelyIf there are two lockers on two connector sides, make sure the lockers are locked in properlyCheck