2007 Arctic Cat 700 Diesel ATV Service Manual, Page 46Get this manual

2007 Arctic Cat 700 Diesel ATV Service Manual, Page 46

8Repeat steps and for the second injector if it was removed9Install the injector hold-down nuts and tighten in four steps
were serviced, static injector timing must be set (see Top-Side Components in this section) 13Using new O-rings, install
the fuel rail and secure with four Allen-head machine screwsTighten to specifications 11Install the injection control rack
by first engaging the governor linkage sleeve; then secure to the injection pump fuel controls with the pivot screwsTighten