2009-2012 Honda MUV700 Big Red Service Manual, Page 281Get this manual

2009-2012 Honda MUV700 Big Red Service Manual, Page 281

Quality of the image is intentionally reduced!

SUB-TRANSMISSIONGEARSHIFT LINKAGE Coat new O-ring with eng ine oil and install it onto the oil filler pipeInstall the filler pipe ith the two boltsConnect th il filler hose onto the pipe Install the E