2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 97Get this manual

2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 97

ENGINE 1Apply Polaris Premium Starter Drive Grease (PN 2871460) to the camshaft main journals and cam lobesLubricate automatic
pinWhen the cam is positioned properly, the cam sprocket alignment pin (A) is directly in line with the crankshaftcamshaft
centerline (B)6Install the sprocket on the camshaftApply Loctite 242 (PN 2871949) to the cam sprocket bolts and torque to
specifications Cam Sprocket Bolt Torque: ftlbs(8 Nm) Single (TDC) Mark Aligned 4Loop the cam chain on the cam sprocket with
the dots on the sprocket facing outward and the alignment pin notch facing directly upward 7Verify TDC mark in timing inspection
hole and alignment pin is directly in line with crankshaft to camshaft centerlineRefer to Illon following page8Apply Crankcase
Sealant (PN 2871557) to the camshaft end cap and install using new O-Ring9Check all cam timing marks to verify proper cam