2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 99Get this manual

2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 99

CAM CHAIN TENSIONER INSTALLATION 2Install new O-Ring in the oil passage recess in the crankcase3Apply Bond 1215 (PN 2871557)
the sealAlign timing reference marks on the plate and crankcaseBe sure the plate is fully seatedNOTE: This is static timing
markStrobe timing should be performed after start up5Torque bolts evenly to specificationStator Plate Bolt Torque: 5-6.5
ftlbs(7-9 Nm) 6Seal stator wire grommet with Crankcase Sealant (PN 2871557) or equivalent sealerFlywheel 1Install flywheel,
washer, and nutTorque flywheel to specificationFlywheel Nut Torque: 58-72 ftlbs(78-98 Nm) STATOR, FLYWHEEL AND STARTER DRIVE
INSTALLATION NOTE: The stator, flywheel, starter drive, and recoil can be assembled with the engine in the frameStator 1Apply