1988-1992 Suzuki LT250R Service Manual, Page 29Get this manual

1988-1992 Suzuki LT250R Service Manual, Page 29

PERIODIC IVIAINTENANCE AND ! TMTMTMTMTMTMTMTMTMTMTMTMTMTMTMTMTMTMTMTM216 CHASSIS NUTS AND BOLTS Tighten Initially at month
-60 3550 2025 1318 1525 85115 4565 5060 160200 Front Rear 116.025.5 TMTMTMTMTM- Wishbone arm inner nut Steering knuckle arm
lower bolt Steering shaft holder bolt Steering shaft lower nut Steering knuckle end nut Brake hose union bolt (Front and
Rear) S7.0123.0 129.043.5 TMTMTMTMTM- 43.5 13.020.0 p.543.5 TMTMTMTMTM- 36.0 r4.518.0 9.513.0 11.018.0 p1.583.0 $2.547.0
$6.043.5 TMTMTMTMTM- 144.5 4.522.5 p2.047.5 Brake pipe connecting nut Brake caliper mounting bolt (Front and Rear) Rear wheel
hub nut Rear wheel set nut Rear sprocket mounting bolt Rear axle lock nut Torque link bolt Disc plate mounting bolt (Front
and Rear) Rear axle housing set nut Rear shock absorber nut (Upper and Lower) Cushion lever center shaft nut Cushion rod