2002-2007 Suzuki 500 LTA Service Manual, Page 319Get this manual

2002-2007 Suzuki 500 LTA Service Manual, Page 319

ELECTRICAL SYSTEM Repeat the above procedure few times and measure the highest pickup coil and power source coil peak voltageTester
the peak volt adaptors followsProbe.Green lead wire Probe.Blue lead wire Power source coil: Probe.Yellow lead wire Probe.White
lead wire Pickup coil: Measure the pickup coil and power source coil peak voltage in the same manner as on the CDI unit couplerTester
knob indication: Voltage) Pickup coil peak voltage: More than 4.0 Power source coil peak voltage: More than 0.3 V Generator
Peak volt adaptor Pickup coil If the peak voltage on the generator coupler is within the specification, but on the CDI unit