2002-2009 Suzuki LT-F250 Ozark Service Manual, Page 135Get this manual

2002-2009 Suzuki LT-F250 Ozark Service Manual, Page 135

DRIVE TRAIN SHIM ADJUSTMENT BACKLASH Install the pinion gear assembly, removed shim and new bearing locknut( 4-13) Tighten
the backlash by referring to the chart at the right and using the thickness of the removed shim as guideBacklash Under 0.05
mm (0.0020 in) 0.05 0.30 mm (0.0020 0.0118 in) Over 0.30 mm (0.0118 in) Shim adjustment Increase shim thickness Correct Decrease
shim thickness 27407-05820 (Shim set: 10 pcs) For right side of ring gear ( Shim thickness 1.26 mm (0.0496 in) 1.32 mm (0.0520
in) 1.38 mm (0.0543 in) 1.44 mm (0.0567 in) 1.50 mm (0.0591 in) 1.56 mm (0.0614 in) 1.62 mm (0.0638 in) 1.68 mm (0.0661 in)
1.74 mm (0.0685 in) 1.80 mm (0.0709 in) LEFT SIDE SHIM SELECTION After the backlash has been checked or adjusted, put few