2004-2009 Suzuki LT-Z250 Service Manual, Page 241Get this manual

2004-2009 Suzuki LT-Z250 Service Manual, Page 241

ELECTRICAL SYSTEM Step 1) Measure the ignition coil primary peak voltage(!8-19) NOTE: This inspection method is applicable
Step 1) Inspect the ignition coil(!8-20) Are the ignition coil OKYES NO Go to Step 6Faulty ignition coil Step 1) Measure
the pickup coil peak voltage and its resistance(!8-20 to -21) NOTE: The pickup coil peak voltage inspection is applicable
only with the multi circuit tester and peak volt adaptorAre the peak voltage and its resistance OKYES NO Faulty CDI Open