2004-2009 Suzuki LT-Z250 Service Manual, Page 244Get this manual

2004-2009 Suzuki LT-Z250 Service Manual, Page 244

ELECTRICAL SYSTEM Shift the transmission to the neutral position, turn the ignition switch to the ON positionPress the starter
wire Measure the pickup coil peak voltage in the same manner as on the CDI unit coupler# Pickup coil peak voltage: 4.0 and
moreTester knob indication: Voltage (&) If the peak voltage on the generator coupler is within the specification, but on
the CDI unit coupler is not within specification, replace the wire harness with new oneIf both peak voltages are out of specification,
replace the generator with new onePICKUP COIL RESISTANCE Remove the left fuel tank side cover(!7-5) Disconnect the generator
couplerMeasure the resistance between the lead wires using the multi circuit testerIf the resistance is not within the specified