2006-2009 Suzuki LT-Z50 QuadSport ATV Factory Service Manual, Page 65Get this manual

2006-2009 Suzuki LT-Z50 QuadSport ATV Factory Service Manual, Page 65

CONROD BIG END SIDE CLEARANCE INSPECTION Push the big end of the conrod to one side and measure the side clearance with
the crankshaft with V-blocks as shown, with the two end journals resting on the blocksPosition the dial gauge, as shown,
and rotate the crankshaft slowly to read the runoutReplace the crankshaft if the runout is more than the service limitCrankshaft
runout: Service Limit: 0.08 mm (0.003 in) 09900-20607: Dial gauge (1100 mm) 09900-20701: Magnetic stand 09900-21304: V-block
set (100 mm) CRANKSHAFT REASSEMBLY When rebuilding the crankshaft, the width between the webs should be within the specified