2007-2009 Suzuki LTZ90 factory service manual, Page 42Get this manual

2007-2009 Suzuki LTZ90 factory service manual, Page 42

PERIODIC MAINTENANCE INITIAL ENGAGEMENT AND CLUTCH LOCK-UP INSPECTION The LT-Z90 is equipped with centrifugal type automatic
check the operation of the drive trainPerform the following: Warm up the engine INITIAL ENGAGEMENT INSPECTION Connect the
multi-circuit tester onto the spark plug high-tension cord Start the engine Slowly open the throttle and note the engine
speed (rmin) when the vehicle begins to move forward09900-25008: Multi-circuit tester set Engagement speed: 800 400 rmin