2007-2009 Suzuki LTZ90 factory service manual, Page 79Get this manual

2007-2009 Suzuki LTZ90 factory service manual, Page 79

Push the big end of the conrod to one side and measure the side clearance using thickness gaugeIf the clearance exceeds
with new oneNOTE:Place the crankshaft onto the V-blocks so that it becomes horizontally Measure the runout from the tips
of the crankshaftCrankshaft runout Service Limit: 0.08 mm (0.003 in) 09900-20607: Dial gauge (1100 mm) 09900-20701: Magnetic
stand 09910-21304: V-block set (100 mm) STARTER CLUTCH INSPECTION Install the starter driven gear onto the starter clutch
and turn the starter driven gear by hand to inspect the starter clutch for smooth movementThe gear turns one direction onlyIf
large resistance is felt to rotation, inspect the starter clutch for damage or inspect the starter clutch contacting surface