2007-2009 Suzuki LTZ90 factory service manual, Page 160Get this manual

2007-2009 Suzuki LTZ90 factory service manual, Page 160

CHASSIS Tighten the tie rod end nut to the specified torque and install the cotter pinTie rod end nut: 50 Nm (5.0 kgfm, 36.0
brake and front suspension, adjust the following items Front brake lever play( 2-20) STEERING Remove the front fender( 5-5)
5-22) Remove the front suspension( Remove the steering head cover 1 Remove the right grip 2, front brake lever Remove the