2008-2009 Suzuki 750 King Quad Service Manual, Page 165Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 165

1D-17 Engine Mechanical: Install the rear brake cable clamp (5) Engine Top Side Disassembly It is unnecessary to remove the
Cable Routing Diagram (Page 1D-1)" and "Water Hose Routing Diagram in Section 1F (Page 1F-3)" Pour engine coolant and engine
oilRefer to "Cooling System Inspection in Section 0B (Page 0B-15)" and "Engine Oil and Filter Replacement in Section 0B (Page
0B-10)" After finishing the engine installation, check the following items: Throttle cable play Refer to "Throttle Cable
Play Inspection and Adjustment in Section 0B (Page 0B-15)" Rear brake cable play Refer to "Rear Brake PedalRear Brake (Parking
Brake) Lever Inspection and Adjustment in Section 0B (Page 0B-19)" Parking Brake cable play Refer to "Rear Brake PedalRear
Brake (Parking Brake) Lever Inspection and Adjustment in Section 0B (Page 0B-19)" Engine oil and coolant leakage Refer to
"Cooling Circuit Inspection in Section 1F (Page 1F-4)" 1) Drain engine coolantRefer to "Cooling System Inspection in Section
0B (Page 0B-15)"2) Remove the seatRefer to "Seat Removal and Installation in Section 9D (Page 9D-11)"3) Remove the battery