2008-2009 Suzuki 750 King Quad Service Manual, Page 171Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 171

1D-23 Engine Mechanical: Cam Chain Guide Install the cam chain guide (1) Apply the engine oil to the threads and both sides
lb-ft) Cylinder head bolt (L: 200) (Final): 37 Nm (3.7 kgf-m, 27.0 lb-ft) CAUTION Replace the cylinder head gasket (2) with
new one I831G1140114-02 After firmly tightening the cylinder head bolts (4), install the cylinder head bolts1 I831G1140111-02
Place the cylinder head (3) on the cylinderNOTE When installing the cylinder head (3), keep the cam chain taut Tightening