2008-2009 Suzuki 750 King Quad Service Manual, Page 180Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 180

Engine Mechanical: 4) Pull out the valve (6) from the combustion chamber side 1D-32 9) Remove the oil gallery plug (cylinder
points: Install the thermostatRefer to "Thermostat Removal and Installation in Section 1F (Page 1F-11)" Instal the ECT sensorRefer
to "ECT Sensor Removal and Installation in Section 1C (Page 1C-4)" Tighten the oil gallery plug (1) (cylinder head) to the
specified torqueTightening torque Oil gallery plug (Cylinder head) (a): 10 Nm (1.0 kgf-m, 7.0 lb-ft)! I831G1140149-01 6)