2008-2009 Suzuki 750 King Quad Service Manual, Page 187Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 187

1D-39 Engine Mechanical: 5) Cool down the new valve guides in freezer for about one hour and heat the cylinder head to 100
distortion6) Apply engine oil to each valve guide and valve guide hole7) Drive the guide into the guide hole using the valve
guide installer! CAUTION Failure to oil the valve guide hole before driving the new guide into place may result in damaged
guide or headSpecial tool (A): 0991644910 (Valve guide remover installer) (D): 0991657360 (Attachment) I831G1140169-01 9)
Reassemble the cylinder headRefer to "Cylinder Head Disassembly and Assembly (Page 1D-31)"10) Install the cylinder head assemblyRefer
to "Engine Top Side Assembly (Page 1D-21)"I718H1140127-01 1Cylinder head "a": IN 14.5 mm (0.57 in) EX 12.5 mm (0.49 in) I831G1140168-01