2008-2009 Suzuki 750 King Quad Service Manual, Page 205Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 205

1D-57 Engine Mechanical: Install the snap ring (3) Install the gearshift cam stopper plate (5)NOTE Align the gearshift cam
"D" with the concave mark "E" of gearshift cam of surface Gearshift System Install the gearshift cam stopper (1), bolt (2),
washer (3) and return spring (4)NOTE Hook the return spring end "A" to the stopper (1) Check the gearshift cam stopper moves