2008-2009 Suzuki 750 King Quad Service Manual, Page 235Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 235

1F-7 Engine Cooling System: Installation Install the cooling fan assembly and radiator in the reverse order of removalPay
to remove the cooling fan Make sure that the battery has capacity enough to supply the motor with 12 With the motor running
at full speed, the ammeter should indicate an amperage not higher than A Pour engine coolantRefer to "Cooling System Inspection
in Section 0B (Page 0B-15)" Bleed air from the cooling circuitRefer to "Cooling System Inspection in Section 0B (Page 0B-15)"
Water Hose Removal and Installation Removal 1) Drain engine coolantRefer to "Cooling System Inspection in Section 0B (Page
0B-15)"2) Remove the front fenderRefer to "Front Side Exterior Parts Removal and Installation in Section 9D (Page 9D-6)"3)
Remove the water hose as shown in the water hose routing diagramRefer to "Water Hose Routing Diagram (Page 1F-3)"Installation
1) Install the water hose as shown in the water hose routing diagramRefer to "Water Hose Routing Diagram (Page 1F-3)"2) Pour