2008-2009 Suzuki 750 King Quad Service Manual, Page 267Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 267

1H-5 Ignition System: 3) Measure the ignition coil resistance in both the primary and secondary coilsIf the resistance is
left side cover and engine side coverRefer to "Front Side Exterior Parts Removal and Installation in Section 9D (Page 9D-6)"2)
Disconnect the CKP sensor coupler (1)NOTE Be sure that all of the couplers are connected properly and the battery is fully-charged
B831G21806004 4) Measure the CKP sensor peak voltage in the following procedures: a) Shift the transfer to the neutral, turn
the ignition switch ONb) Press the starter button and allow the engine to crank for few seconds, and then measure the CKP
sensor peak voltage5) Repeat the b) procedure few times and measure the highest CKP sensor peak voltageCKP sensor peak voltage
5.0 and more (Blue White) 6) If the peak voltage is within the specification, check the continuity between the CKP sensor
coupler and ECM coupler! CAUTION Normally, use the needle pointed probe to the backside of the lead wire coupler to prevent
the terminal bend and terminal alignment7) After measuring the CKP sensor peak voltage, reinstall the removed parts I831G1180008-01