2008-2009 Suzuki 750 King Quad Service Manual, Page 281Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 281

1I-11 Starting System: Installation Install the starter clutch in the reverse order of removalPay attention to the following
to the specified torque: Thread lock cement 9900032030 (THREAD LOCK CEMENT SUPER 1303 or equivalent) Tightening torque Starter
clutch bolt (a): 26 Nm (2.6 kgf-m, 19.0 lbft) I831G1190033-01 I831G1190035-01 Apply engine oil to the bearing of the starter
driven gear I718H1190031-01 Install the guide to the generator rotorNOTE The arrow mark "B" must face the generator rotor