2008-2009 Suzuki 750 King Quad Service Manual, Page 292Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 292

Charging System: Repair Instructions Battery Current Leakage Inspection Inspect the battery current leakage in the following
tester set) Tester knob indication Voltage) Regulated voltage (Charging output) Standard: 13.5 15.0 at 000 rmin Battery CAUTION
In case of large current leak, turn the tester to high range first to avoid tester damage Do not turn the ignition switch
ON when measuring currentSpecial tool0990025008 (Multi-circuit tester set) Tester knob indication Current, 20 mA) Battery
current (Leak) Under 2.6 mA (DCV) Tester I649G11A0003-02 4) Install the seat Generator Inspection Generator Coil Resistance
1) Remove the left side cover and engine side coverRefer to "Front Side Exterior Parts Removal and Installation in Section
9D (Page 9D-6)"2) Disconnect the generator coupler (1) B831G21A06003 I649G11A0002-02 5) Connect the () battery terminal and
install the seat Regulated Voltage Inspection Inspect the regulated voltage in the following procedures: 1) Remove the seatRefer