2008-2009 Suzuki 750 King Quad Service Manual, Page 295Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 295

1J-6 Charging System: 17) Remove the generator rotor assembly (10) with the special toolNOTE Remove the starter clutch if
(1) is set to the generator coverTightening torque Generator stator set bolt (a): 11 Nm (1.1 kgf-m, 8.0 lb-ft) CKP sensor
mounting bolt (b): Nm (0.6 kgf-m, 4.5 lb-ft) Lead wire clamp bolt (c): Nm (0.6 kgf-m, 4.5 lbft) I831G11A0012-01 18) Remove
the key (11) I831G11A0016-03 Degrease the tapered portion "A" of generator rotor assembly and also the crankshaft "B"Use
nonflammable cleaning solvent to wipe off oily or greasy matter to make these surfaces completely dry Fit the key (2) in