2008-2009 Suzuki 750 King Quad Service Manual, Page 386Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 386

3B-30 Differential: Install the final driven gear (8) and shim(s) (9) into the final gear case Check the backlash and tooth
the O-ring to the final gear cover (11) Apply small quantity of grease to the O-ring: Grease 9900025010 (SUZUKI SUPER GREASE
or equivalent) I831G1320127-01 Final DrivenDrive Gear Bering Inspect the bearings for abnormal noise and smooth rotationReplace
the bearings if there is anything unusualI831G1320125-01 Apply small quantity of thread lock to the final gear cover tools
and tighten them to the specified torque diagonally: Thread lock cement 9900032030 (THREAD LOCK CEMENT SUPER 1303 or equivalent)