2008-2009 Suzuki 750 King Quad Service Manual, Page 412Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 412

3D-2 Propeller Shafts: 4) Remove the front output shaft (1) from the right crankcase Install the front output shaft to the
Front Output Shaft Disassembly and Assembly Refer to "Front Output Shaft Removal and Installation (Page 3D-1)"Disassembly
1) Remove the C-ring (1) and snap ring (2)Special tool0990006107 (Snap ring pliers) B831G23406003 I831G1340097-01 Apply small
quantity of grease to the O-ring (1) CAUTION Replace O-ring (1) with new one: Grease 9900025010 (SUZUKI SUPER GREASE or equivalent)