2008-2009 Suzuki 750 King Quad Service Manual, Page 414Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 414

3D-4 Propeller Shafts: Assembly! CAUTION 4) Install the oil seal (4) with the suitable socket wrench5) Apply grease to the
grease to the O-ring (5): Grease 9900025010 (SUZUKI SUPER GREASE or equivalent) I831G1340012-01 2) Install the front output
shaft bearing (front) to the front output shaft housing with the special toolSpecial tool (A): 0991370210 (Bearing installer
set) I831G1340016-02 8) Install the output shaft housing (6) and front drive collar assembly (7) to the front output shaft9)
Install the snap ring (8), C-ring (9) and O-ring10) Apply small quantity of grease to the O-ringI831G1340013-01 3) Install