2008-2009 Suzuki 750 King Quad Service Manual, Page 444Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 444

4A-7 Brake Control System and Diagnosis: 7) Loosen the air bleeder valve and pump the brake lever until the old brake fluid
in the front brake hose routing diagramRefer to "Front Brake Hose Routing Diagram (Page 4A-1)"Installation CAUTION I831G1410013-01
9) Fill the reservoir with brake fluid The seal washers should be replaced with the new ones to prevent fluid leakage1) Install
the front brake hose as shown in the front brake hose routing diagramRefer to "Front Brake Hose Routing Diagram (Page 4A-1)"2)
Tighten the brake flare nut (1) to the specified torqueTightening torque Brake pipe flare nut (a): 16 Nm (1.6 kgf-m, 11.5
lb-ft) I831G1410036-01 10) Install the reservoir cap11) Install the front wheelsRefer to "FrontRear Wheel Removal and Installation