2008-2009 Suzuki 750 King Quad Service Manual, Page 515Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 515

6B-5 SteeringHandlebar: Apply adhesive agent to the handlebar right and left end and right and left grip inner wall: Handle
lever case bolts (6) to the specified torqueTightening torque Throttle lever case bolt (c): Nm (0.5 kgf-m, 3.5 lb-ft) Insert
the projection "D" of the left switch assembly into the hole of the handlebars I831G1620015-02 I831G1620018-03 Tighten the
left handlebar switch screws Handlebars Inspection Refer to "Handlebars Removal and Installation (Page 6B-3)"Inspect the
handlebars for distortion or damageIf any defects are found, replace the handlebars with new one B831G26206004 I831G1620016-01