2008-2009 Suzuki 750 King Quad Service Manual, Page 603Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 603

1I-2 Starting System: Starter Motor Removal and Installation (LTA750XPZK9) B931G41906023 Removal 1) Turn the ignition switch
wire mounting nut (b): Nm0.6 kgf-m, 4.5 lbf-ft) I931G3190003-02 I931G3190001-02 4) Remove the starter motorInstallation Install
the starter motor in the reverse order of removalPay attention to the following points: Apply grease to the starter motor
O-ring: Grease 9900025010 (SUZUKI SUPER GREASE "A" or equivalent)! Starter Motor Disassembly and Assembly (LTA750XPZK9) Refer
to "Starter Motor Removal and Installation in related manual" B931G41906024 Disassembly Disassemble the starter motor as
shown in the starter motor components diagramRefer to "Starter Motor Components in related manual"Assembly Reassemble the
starter motor in the reverse order of removalPay attention to the following points: CAUTION Replace the O-ring with new one