2008-2009 Suzuki 750 King Quad Service Manual, Page 633Get this manual

2008-2009 Suzuki 750 King Quad Service Manual, Page 633

SteeringHandlebar: Apply adhesive agent to the handlebar right and left end and right and left grip inner wall: Handle grip
"F" of the throttle lever case I831G1620014-02 5Handlebar "C": Apply handle grip bond I931G3620007-01 Tighten the throttle
lever case bolts (7) to the specified torqueTightening torque Throttle lever case bolt (c): Nm (0.4 kgf-m, 3.0 lbf-ft) Insert
the projection "D" of the left handlebar switch assembly into the hole of the handlebars I931G3620005-01 I931G3620008-01