2008 Suzuki LT-A400/F, LT-F400/F ATV Service Manual, Page 223Get this manual

2008 Suzuki LT-A400/F, LT-F400/F ATV Service Manual, Page 223

Charging System: When installing the transfer gearshift arm, align the wide spline teeth of the arm and shaft 1J-9 Tighten
of thread lock to the recoil starter mounting bolts and tighten to the specified torque: Thread lock cement 9900032110 (THREAD
LOCK CEMENT SUPER 1322 or equivalent) Tightening torque Recoil starter mounting bolt (g): 10 Nm (1.0 kgfm, 7.0 lb-ft) I827H11A0026-03
Connect the oil hoseRefer to "Oil CoolerOil Cooler Hose Removal and Installation in Section 1E (Page 1E-10)" Apply grease