1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 62Get this manual

1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 62

Synchronization and Linkage Adjustments Rope V4 It is important that this step-by-step procedure be followed in sequence
firmly againstConsider this mark the tool, mark the flywheel directly across from the pointerII rv piston contactturn felt
flywheelMarka clockwise direction until 5Continue to the in is againthis exact spot on the flywheel and consider this mark
"8"Remove the piston stop tool rv theUse flexible scale marks "A" flywheel edge and midpoint 6along the measure midpoint
between and "8"Mark the on the rim of the flywheelConsider this mark "C"If the mark "C" and the cast-in TDC line are in agreement,
the timing pointer aiignment is correctIf not, proceed to Step 7 rv 7Turn the flywheel to align the mark "C"the pointerpointerwith