1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 301Get this manual

1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 301

27 cloth around the assemblyPull the detent lever out ofthe bearing housing and remove the detent ball Q), spring ,and the
24If the driveshaft bearing must be replaced, use OMC Bearing Remover and Installer, PIN 391257, and assemble it as follows:
Flange Nut, PIN 326586 Plate, PIN 391260 Rod, PIN 326582 Remover, PIN 326579 ill forceWear safety glasses for eye protectionPut
shop 20 The detent ball and spring can come out with great r::=J Make sure all 19 needle bearings are inside bearing case
before pulling bearingThe needle bearings will provide surface for the remover tool to pull againstTurn nut and pull bearing