1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 328Get this manual

1994 Johnson Evinrude "ER" 90 LV 120 thru 140, 185 thru 225, 250, 300 Service Manual P/N 500612, Page 328

6Lightly coat the detent ball and spring with OMC Needle Bearing Assembly GreaseFirst, insert the spring in the housing,
of the housingDepress the ball and spring with punch while pushing the detent lever into the housingOnce the detent lever
is past the ball, rotate the lever toward the rear of the housing, then move the detent lever to engage NEUTRAL positionrJl1gl
9V6Place the cradle on the shift shaftthen rest the shifter on the cradleSlide the shaft into the housing and insert the
shifter tip into the detent's pocketInstall the pivot pin vaFace the narrow arms of the shifter toward the bearing opening,