1994 Johnson/Evinrude Electric outboards Service Manual, Page 79Get this manual

1994 Johnson/Evinrude Electric outboards Service Manual, Page 79

Installation 1Route electrical leads and steering control cable through new heat shrink sleeve2Install the steering cable
mark on steering gear with index mark on pinion flangeEngage steering gear teeth with pinion and slide steering gear down
on pivot post6Apply OMC Screw Lock to steering cable set screwPosition steering cable and install set screw7Place one metal
cup and one rubber washer on cable nut8Insert cable into pedal base 9prace one rubber washer and one metal cup on cable 10Install