1995 Johnson/Evinrude Outboards 9.9, 15 four-stroke Service Manual, Page 163Get this manual

1995 Johnson/Evinrude Outboards 9.9, 15 four-stroke Service Manual, Page 163

10Coat the shift rod a-ring with OMC Triple-Guard grease and install in shift rod bushing rn 11Place new washer and bushingGasketOMC
through the shift rod bushing and into the shifter yokeRemove the cradle from the yokeThen, while pulling on the yoke locator,
guide the assembly into the gearcaseThe forward gear should come to rest against the forward bearing, and the shift lever
should be located in the slot at the bottom of the gearcase []] 14Position one pinion thrust washer on the pinionOil and
install the thrust bearing Install the other thrust washer on the pinion[] 15Install the pinion in the gearcaseINotellfthe