1996 Johnson Evinrude "ED" 40 thru 55 2-Cylinder Service Manual, P/N 507124, Page 336Get this manual

1996 Johnson Evinrude "ED" 40 thru 55 2-Cylinder Service Manual, P/N 507124, Page 336

Sending Unit Adjustment r:jl 1The sending unit eccentric cam must be adjusted so that the gauge needle is aligned with the
cam just forward of the top of the cam at about rv rJl fullLoosen gauge position: rotate eccentric cam to adjust 5cam screw,
and down If the needle was above the lowest markmove the thick part of the cam TOWARD the contact point Tighten the screw,
and recheck the gauge reading If the needle was below the lowest markmove the thick part of the cam AWAY from the contact
point Tighten the screw, and recheck the gauge reading6Tighten eccentric cam retaining screw and check needle position at