1999 Polaris PWC Genesis, Ficht, X-45 Service Manual, Page 287Get this manual

1999 Polaris PWC Genesis, Ficht, X-45 Service Manual, Page 287

FICHT FUEL INJECTION Specifications Tests SERVICE SPECIFICATIONS Fuel System Pressure Injector Unit Resistance Spark Plug
Position Sensor Resistance Test: Measure resistance of sensorThrottle Position Sensor Resistance Test: Contact meter leads
10 red and black wire sensor pinsMeter should read greater than 3000 QMove one meter lead to green wire pin and move sensor
arm smoothlymeter reading should change evenly with arm movementRetain meter lead on green wire pin and alternate the other
lead to the other sensor pinRepeat procedureany erratic meter reading change indicates sensor problem Air Temperature Sensor
Resistance Test Water Temperature Sensor Resistance Test: Measure resistance of sensorStator Resistance Tests: NOTE: Disconnect
battery cables before proceeding with this test1Disconnect stator 12 pin connector from EMM2Connect one meter lead to stator
connector #1 and the other meter lead to stator connector #123Continue checks on all stator connections(See EMM 12 Pin Connector
schematic, Chapter 9, page 9.22)4To check for grounded condition, connect one meter lead to ground wire and alternately connect