2000 Polaris Pro 785 Service Manual, Page 365Get this manual

2000 Polaris Pro 785 Service Manual, Page 365

ENGINECOOLING Engine InstallationFuji Engine Installation Engine installation is done in reverse order of the removal instructions
gaskets on the exhaust system and electrical boxRemember to inspect for damage on any wiringhoses, or lines before and after
reinstalling the engineMake sure all cables, hoses, and wiring are routed and secured properlyAfter engine installationpump
alignment must be inspectedRefer to the Final Drive section for inspection and alignment procedures Shims used for engine
and driveshaft alignment must be reinstalled in their original locations Do not allow them to be mixed upAlways verify proper