2000 Polaris Virage TX, SLX, Pro 1200, Genesis, Genesis FFI Personal Watercraft Service Manual, Page 153Get this manual

2000 Polaris Virage TX, SLX, Pro 1200, Genesis, Genesis FFI Personal Watercraft Service Manual, Page 153

http:ReadManm ENGINE Engine InstallationPolaris Engines Engine Installation Engine installation is done in reverse order
engineMake sure all cables, hoses, and wiring are routed and secured properlyAdjust throttle cable and check throttle operationIt
must operate freely and return completely when releasedVerify proper operation of engine stop switchAfter engine installation,
pump alignment must be inspectedRefer to the Final Drive section for inspection and alignment proceduresSynchronize carburetors
and be sure they are cleanAdjust oil pump cable and bleed pumpThe first tank of fuel should be pre-mixed with Polaris Premium
cycle or Premium Synthetic cycle oil at 40:1 ratio Shims used for engine and driveshaft alignment must be reinstalled in
their original locationsDo not allow them to be mixed upAlways verify proper engine to pump alignment after engine installation
as outlined in the Jet Pump, Final Drive, sectionIn most cases, the number of shims used in production is marked in permanent