Bombardier SeaDoo 1990 factory shop manual, Page 29Get this manual

Bombardier SeaDoo 1990 factory shop manual, Page 29

Section 03 ENGINE Sub-section 02 (REMOVALINSTALLATION) 1.3,4,5, Nut, Tune Pilpe0-Ring Make sure that O-rings are properly
and hullFinal Inspection1 Check throttle cable condition then after its installation, properly adlust and synchronize oil
injection pump as specified in "OIL SYSTEM", section 06Bleed oil injection pumpPressure test fuel systemSecure vent tube
to the batteryEnsure vent tube is not kinked or obstructedVerify all connectionsand hoses conditionRun engine and ensure