Bombardier SeaDoo 1992 factory shop manual, Page 111Get this manual

Bombardier SeaDoo 1992 factory shop manual, Page 111

Section 05 FUEL SYSTEM Sub-section 03 (CARBURETOIRS) Pressure Test Proceed as follows - Install pump gauge tester on carburetor
lever, do not pry it so that it applies pressulre needleThis could damage valve seatineedleInstall on nipple Depress here
then push tab down If release pressure is not within specification, check control lever adjustmentReplace spring as necessary
HIGH LEVER CAUTIONDo not stretch or cut springLeak Test Depress here then up here Needle valve must stand pressure of 69
kPa (10 PSI) for 30 seconds Otherwise, hold carburetor upside down, pour oil over needle valve and apply pressureCheck for
bubblesIf they come from seat O-ring, bubbles will exit around seatRetighten as necessary If it still leaks remove needle