Bombardier SeaDoo 1992 factory shop manual, Page 193Get this manual

Bombardier SeaDoo 1992 factory shop manual, Page 193

Section 08 PROPULSIOIN AND DRIVE SYSTEMS Sub-section 01 (PROPULSION AND DRIVE SYSTEMS) CAUTIONThis is synthetic oilDo not
apply synthetic grease293 550 0101 on drive shaft splines and impeller splines Make sure rubber damper is on drive shaft
end Insert drive shaft in impeller then carefully insert boot in impeller Use blade of screwdriver to push on boot 17,20,35,
Venturi, Screw and O-ring Install new O-rings around bailer passages Position ventun with bailer passages on top Apply Lactite
515 Gasket Eliminator 293 800 0071 on mating surface Apply Loctite 242 (blue) 293 800 01151 on threads and install screws
and washers then torque to 25 Nm (18 !bfft) in criss-cross sequence Bailer passages aligned Loctiie 242 (blue) on mating
surface Loctite 515 NOTEOn aluminum material it is recommended to use Loctite primer293 600 0121 to reduce curing time and