Bombardier SeaDoo 2003 factory shop manual, Page 614Get this manual

Bombardier SeaDoo 2003 factory shop manual, Page 614

Quality of the image is intentionally reduced!

Section 13 PROPULSION SYSTEM Subsection 02 (JET PUMP)
Install O-rings no38 around bailer passages or make sure they are in place if they were not removed
PUMP PRESSURIZATION
Whenever