2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 365Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 365

Quality of the image is intentionally reduced!

Chassis Left Bulkhead Clip Installation

CAUTION
The fasteners must be torqued within the adhesive working time of to 10 minutesCross Shaft Fasteners: 35 ft-lb (47 Nm)

B