2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 373Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 373

Quality of the image is intentionally reduced!

Chassis 5 Remove the four remaining brace screws and nutsNote the screw located on the inside of the brace attaching the brace to the bulkhead cooler8 Note the residual adhesive on the brace, bulkhead