2006-2008 Yamaha RS, Vector, Rage Factory Service Manual, Page 130Get this manual

2006-2008 Yamaha RS, Vector, Rage Factory Service Manual, Page 130

PRIMARY SHEAVE AND DRIVE V-BELT Tighten the spider to specification using the bar wrench 3Spider: 200 Nm (20.0 kg, 145 ft
sheave, and special tool are well securedTighten the spider carefully to prevent cracks and damage to the sheaves and spider
5Install: Weight Bolts Nuts Set bolt Nut: Nm (0.6 kg, 4.3 ft lb) Set bolt: Nm (0.4 kg, 2.9 ft lb) LOCTITE To maintain the
primary sheave balance, the bolts must be installed with their threaded portions pointing in counterclockwise direction,