2007-2008 Yamaha Phazer Venture-Lite 500 Factory Service Manual, Page 193Get this manual

2007-2008 Yamaha Phazer Venture-Lite 500 Factory Service Manual, Page 193

CAMSHAFTS INSTALLATION 1Install: Intake camshaft sprocket (with the special tool 2) Rotor holding tool: 90890-01235, YU-01235
counterclockwise When piston #1 is at TDC on the compression stroke, align the TDC mark on the A.Cmagneto rotor with the
stationary pointer on the A.Cmagneto cover Install the timing chain onto both camshaft sprockets, and then install the camshafts
When installing the timing chain, start with the exhaust camshaft and be sure to keep the timing chain as tight as possible