2010-2011 Yamaha RS Vector / RS Venture Service Manual, Page 403Get this manual

2010-2011 Yamaha RS Vector / RS Venture Service Manual, Page 403

Quality of the image is intentionally reduced!

LIGHTING SYSTEM LOAD CONTROL RELAY 1 Remove: Load control relay

Inspection steps: Connect the analog pocket tester (pocket tester)1) and battery (12 V) to the load control relay terminals